# Reddit examples — follow-ups (deferred from initial plan) Items deliberately deferred from `docs/plans/2026-05-28-reddit-examples-plan.md` so the initial cut can ship without disproportionate scaffolding. ## Prometheus counters (Task 11a) The design doc names four counters: - `fire_examples_scraped_total{sub}` - `fire_examples_extracted_total{sub,confidence_bucket}` - `fire_examples_llm_fallback_total` - `fire_examples_extract_failed_total{reason}` Current state: log-based observability only. The ingest CLI emits one "ingest done: inserted=X skipped=Y sub_runs_succ=Z/T" line per run. Reason for deferral: the ingest runs once a week via CronJob. Wiring `prometheus_client` Counters into a non-FastAPI Job requires either a pushgateway hop or a metrics-emitting HTTP endpoint exposed for the Job's lifetime — both are disproportionate plumbing for a weekly batch. Revisit if we ever need drift signal (e.g., extraction quality collapsing silently) or higher cadence. ## Fixture expansion The design said 20 hand-curated fixtures; Task 12 ships with 5 (one per fi_status / currency combination that exercises a distinct code path). Add the remaining 15 once the live ingest has run — pull candidates from the real DB by hand and lock them in as regression anchors. ## Pushshift / pullpush.io for older posts PRAW's `top-of-all-time` caps at 1000 posts per subreddit. For the 12 target subs that's ~12k posts before deduplication. If a Q3-2027 review of `fire_planner.fire_example` shows we're consistently missing milestone posts older than the cap, layer pullpush.io as a secondary source feeding the same pipeline.