All checks were successful
ci/woodpecker/push/default Pipeline was successful
Viktor asked for one diagram showing just the physical connections between nodes, separate from the logical/VLAN topology: ISP->AX6000, the in-wall apartment->garage run into P1, 4G router (cellular OOB), UPS mgmt, the PoE cat6 to the camera, the LAN1 cable to eno1, dark eno2 fallback + free eno3/4, iDRAC on shared-LOM, and the note that everything else on the R730 is virtual. Referenced from the ADR next to the logical SVG. Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>
126 lines
9 KiB
XML
126 lines
9 KiB
XML